Client: Rio Tinto Group
Location: Newman, WA 6753
Works Decription: PFS through to detailed design of ROM and access ramps, AHS haul road, staffed haul roads, LV access tracks, erosion and sediment control ponds, stormwater drainage diversions, and associated infrastructure, including swept path assessments. Hydraulic modelling was undertaken to support stormwater management and drainage performance across the site.
Service Provided – PFS to Detailed Design:
· Earthworks Design
· Roadworks Design
· Drainage Design
· Swept Path Analysis
· 2D Hydrologic & Hydraulic Modelling
· 3D Modelling
· Material Quantity Take-off
· CAD Conforming to Client Standards
Client: Rio Tinto Group
Location: Newman, WA 6753
Works Decription: PFS through to detailed design of ROM and access ramps, AHS haul road, staffed haul roads, LV access tracks, erosion and sediment control ponds, stormwater drainage diversions, and associated infrastructure, including swept path assessments. Hydraulic modelling was undertaken to support stormwater management and drainage performance across the site.
Service Provided – PFS to Detailed Design:
· Earthworks Design
· Roadworks Design
· Drainage Design
· Swept Path Analysis
· 2D Hydrologic & Hydraulic Modelling
· 3D Modelling
· Material Quantity Take-off
· CAD Conforming to Client Standards